Home

AI Infrastructure — Abu Dhabi, UAE

Powering the
AI Era.

The UAE’s AI infrastructure platform. Delivering large-scale AI campuses through a full Design-Build-Operate lifecycle — purpose-built to support the UAE’s national AI strategy and long-term digital infrastructure ambitions.

1 GW
Abu Dhabi campus program

Built to Develop. Not to Hold.

ORATIL is the UAE’s AI infrastructure platform — a dedicated entity that delivers large-scale AI campuses through a full Design-Build-Operate lifecycle, from land and power acquisition through to construction, commissioning and operations.

Headquartered in Abu Dhabi, built specifically to support the UAE’s AI ambitions and long-term digital infrastructure strategy.

About ORATIL →

Flagship Development

Abu Dhabi
1 GW Campus

JV
ORA Advanced Technology × Tillman Global

Infrastructure for the Most Demanding Workloads

All Solutions →

Colocation

Secure, scalable colocation within AI-optimized facilities. Built for density, with power and cooling infrastructure engineered for the most demanding compute environments.

Learn More →

Build-to-Suit

Custom data center campuses developed to exact specifications. From site selection to energization, we manage every phase of the development lifecycle.

Learn More →

Power & Utility Infrastructure

Reliable, high-capacity power delivery with redundant systems engineered for zero-downtime operations. Supporting deployments from 10 MW to gigawatt scale.

Learn More →

AI Infrastructure for the UAE

1 GW

Middle East — Flagship

Abu Dhabi Campus

AI-optimized gigawatt-scale campus program in the heart of the UAE

Proven Experience

European Expansion

Backed by proven large-scale delivery expertise, built to serve Europe’s growing AI infrastructure demand

Global Track Record

1,850 MW Delivered

A development program built on world-class engineering and proven infrastructure expertise

Technical Position

Engineered for AI at Hyperscale.

ORATIL’s infrastructure is engineered to meet the exacting demands of AI and large-scale compute — delivering the high power densities required by modern AI workloads, with advanced liquid and air cooling architectures engineered for next-generation GPU and AI accelerator deployments.

Our facilities are designed to Tier III+ and Tier IV standards, with 2N power redundancy, carrier-neutral connectivity, and sub-10ms latency access to major regional internet exchanges.

Power Density

30kW

Per rack, with higher densities available

Availability

99.999%

Five-nines uptime target

Design Standard

Tier IV

Fault-tolerant infrastructure

Redundancy

2N

Full power redundancy

ESG Position

Responsible Infrastructure for a Sustainable Future.

ORATIL is committed to responsible infrastructure development. Our campuses are designed with energy efficiency at their core, designed to maximize energy efficiency across all operational systems.

We are actively integrating renewable energy sources across our development programs, with a long-term commitment to achieving net-zero carbon operations in alignment with the UAE Net Zero 2050 Strategic Initiative.

Renewable Energy Integration

Solar energy integration and renewable power procurement across all campus developments.

Energy Efficiency

Advanced energy management systems engineered to minimize operational costs and environmental impact.

Water-Efficient Cooling

Advanced cooling systems designed to minimize water consumption in the UAE’s arid climate.

UAE Net Zero 2050 Aligned

All developments aligned with the UAE Net Zero 2050 Strategic Initiative and responsible construction practices.

Built for the world’s most demanding infrastructure requirements

Ready to Build at Scale?

Discuss your infrastructure requirements with the ORATIL team.

Get in Touch