Abu Dhabi Campus

← Back to Projects

Middle East — Flagship Development

Abu Dhabi
Campus.

ORATIL’s landmark gigawatt-scale AI infrastructure development in the heart of the UAE — one of the most ambitious data center programs in the region.

1 GW
Total campus capacity
Abu Dhabi
Location, UAE
AI+
Optimized for AI workloads
H/S
Hyperscaler-ready

A New Era of AI Infrastructure in the UAE

ORATIL’s Abu Dhabi campus represents one of the most ambitious AI infrastructure programs in the Middle East. Designed from the ground up for the density, power, and cooling demands of modern AI and hyperscale workloads, the campus is positioned to become a cornerstone of the UAE’s sovereign digital infrastructure.

The 1 GW program is being developed in strategic partnership with the UAE government and global hyperscalers, reinforcing Abu Dhabi’s position as a leading global hub for AI and digital innovation.

Built for the World’s Most Demanding Workloads

Total Capacity

1 GW

Gigawatt-scale campus program — one of the largest AI-optimized data center developments in the Middle East.

Design Standard

Tier IV

Designed to the highest availability and redundancy standards, ensuring zero-downtime operations for mission-critical workloads.

Power Redundancy

2N

Full 2N power redundancy with multiple independent utility feeds and on-site generation for complete resilience.

Cooling

AI-Ready

Advanced cooling infrastructure engineered for high-density AI and GPU compute, supporting next-generation rack densities.

Connectivity

Carrier-Neutral

Carrier-neutral facility with diverse fiber entry points and direct access to major regional and international cable systems.

Sovereignty

UAE-Sovereign

Fully compliant with UAE data sovereignty requirements, supporting government, enterprise, and hyperscaler workloads.

Phased Delivery Program

Phase 1

Site Acquisition & Planning

Strategic site selection in Abu Dhabi, securing land with optimal power infrastructure access and proximity to key connectivity hubs.

Phase 2

Design & Engineering

Full campus design and engineering, incorporating hyperscaler requirements and AI-optimized specifications across all systems.

Phase 3

Construction & Build-Out

Phased construction program delivering initial capacity ahead of full campus build-out, ensuring rapid time-to-market for hyperscaler partners.

Phase 4

Energization & Operations

Full energization and commissioning of campus facilities, transitioning to live operations with 24/7 monitoring and support.

Interested in This Development?

Connect with our team to discuss colocation, build-to-suit, or partnership opportunities at our Abu Dhabi campus.

Get in Touch All Projects